Bathrooms Rebuilt From the Structure Out

Bathroom remodeling in Scranton for older homes where drain lines and framing need inspection before new work begins

A bathroom in a house built before 1970 is rarely a straightforward replacement of fixtures and tile. The drain lines are likely cast iron or early PVC, the framing around the tub may have been carrying moisture for years, and the wiring often predates GFCI requirements that are now standard in wet locations. Litvin & Sons takes on bathroom remodeling in Scranton and the surrounding area by opening the room first, so those conditions are identified before tile or flooring commits the layout. The owner oversees the field work directly and coordinates plumbing, electrical, flooring, and finish work as one project rather than handing off between separate contractors.


The job is scoped by stripping the room to the studs, which puts framing, drain lines, and electrical circuits in view before any decisions about layout are finalized. Plumbing and electrical are roughed in to inspection before tile and flooring go down, and fixtures and trim are set only after the finish surfaces are complete. Pennsylvania contractor license No. 4498 covers all phases of the work.


Request an initial walkthrough so the existing drain configuration and framing condition can be assessed before your bathroom remodel is scoped.

Why Opening the Room First Changes What Gets Built

The decision to strip a bathroom to the studs rather than remodel over existing surfaces is driven by what those surfaces are covering. In homes with original framing, water that has reached the subfloor around a tub or toilet over many years often compromises the structural members below the finished floor before any visible damage appears at the surface. Identifying and replacing that framing before tile goes down is the difference between a remodel that holds and one that develops soft spots and grout failures within a few years.


Once the rough-in inspections are signed off, tile is set on a properly prepared substrate, flooring is installed as a complete field, and fixtures are set plumb and secured to backing that was added specifically for that purpose during framing. The finished room has solid blocking behind grab bar locations, correctly sloped drain lines, and GFCI protection at every outlet, which are observable details that distinguish work done to a complete standard from work done to a visual standard only.


Bathrooms in Pittston and similar communities with older housing stock often have drain lines that connect to cast iron stacks with lead or oakum joints, which are functional but not compatible with modern PVC connections without proper adapter fittings. Recognizing that condition during rough-in, rather than after tile is set, determines whether the drain connection gets made correctly the first time.

Common Questions About This Service

These questions address how bathroom remodeling is actually performed, with particular attention to the conditions found in older homes where the work involves more than a cosmetic update.

  • How does the crew determine whether the subfloor under a tub or shower needs replacement?

    The subfloor is evaluated once the tub or shower unit is removed and the surrounding framing is visible, and any section that shows compression, discoloration, or soft spots under foot pressure is replaced before the new installation begins.

  • What does roughing in plumbing before tile mean in practical terms?

    Rough-in means all supply lines, drain connections, and vent tie-ins are set in their final positions and inspected by a code official before any wall or floor surface is closed up, so the layout is locked before tile or flooring commits it.

  • Why does electrical work have to be addressed in a bathroom remodel even if the outlets appear functional?

    Older bathrooms in Scranton-area homes frequently have receptacles that predate GFCI requirements, and a remodel that opens the walls is the practical point at which that protection gets added to meet current code.

  • How is tile set differently in a shower versus on a bathroom floor?

    Shower walls and floors require a waterproof membrane system behind and beneath the tile so water that penetrates grout joints doesn't reach framing, while floor tile outside the wet area is set over a standard underlayment without that membrane layer.

  • What backing is needed for grab bars or future hardware to be mounted securely?

    Grab bars and heavy hardware require solid blocking installed between studs during framing, because drywall anchors alone won't carry the load reliably over time, especially in tile walls where the anchor has to penetrate multiple layers.

Litvin & Sons also completes bathroom remodeling in Wilkes-Barre, Dunmore, Clarks Summit, Pittston, and Lake Wallenpaupack. To discuss what your bathroom's existing framing and drain configuration will require, call Litvin & Sons at (570) 909-4778 and arrange a time to walk the space before work begins.