Old Walls Opened Right Before Any New Work Starts

Home remodeling in Scranton for properties where outdated framing, wiring, and plumbing are discovered once walls come down

Many homes in Scranton's older neighborhoods—including areas like Hyde Park and the West Side—were built with layouts that cannot be updated without opening walls to the studs. When a remodel reaches that point, the existing framing, plumbing, and wiring all become visible at once, and decisions made about each system affect the others. Litvin & Sons coordinates all three within the same project, so one crew assesses and sequences the work rather than leaving the homeowner to schedule separate trades around each other.


Work begins by opening the affected walls and floors to expose the existing structure. That assessment determines what the finish work plan can actually include—where new walls can be placed, how plumbing can be rerouted, and whether the electrical panel has capacity for what the remodel adds. Handling plumbing, electrical, and flooring within the same project means each system is roughed in while walls are open and confirmed before anything is closed up. Pennsylvania contractor license No. 4498 covers the work, and the business was already operating when the state licensing program began.


Schedule a walkthrough of the spaces you plan to remodel so the existing conditions can be assessed before any finish selections are made.

How One Crew Coordinating Trades Changes the Outcome

The practical difference between a coordinated remodel and a segmented one shows up when systems overlap. A kitchen remodel that adds a new appliance circuit while the wall is open for plumbing rerouting saves reopening finished drywall later. When one contractor is accountable for sequencing those steps, the decision about which rough-in work happens first is made before walls close—not discovered afterward when one trade's work blocks another's.


After the rough-in phase is complete and inspected, drywall, flooring, and finish carpentry proceed in sequence. What you notice at that point is a remodeled space where the surfaces, transitions, and layout reflect what was planned at the estimate stage rather than what was improvised around pre-existing obstacles. Litvin & Sons confirms scope and materials in writing before work begins, so each phase is defined and the homeowner knows what is included.


Some remodels extend beyond the originally scoped area once walls are open and structural or system conditions become visible. When that happens, the additional work is identified before it is performed and confirmed with the homeowner, not added without discussion and billed at completion.

Answers About How the Remodeling Work Is Done

The questions below focus on how whole-home remodeling is sequenced and what conditions in older Scranton properties typically affect that process.

  • What is assessed when walls are first opened during a remodel?

    The framing is checked for load paths and condition, existing wiring is traced to identify where circuits originate and what capacity is available, and plumbing supply and drain lines are located before any finish work is planned around them.

  • Why does electrical work get handled during the remodel rather than before or after?

    With walls already open for other work, new circuits are run and connected while access is available, which avoids reopening finished surfaces and allows inspections to happen at the correct stage before drywall is installed.

  • How does the age of a home's framing affect how a remodel is scoped?

    Older framing in Scranton properties was frequently cut or notched by previous trades over decades, so the structural condition of the framing has to be confirmed before new loads or wall openings are planned.

  • What happens after rough-in work passes inspection?

    Insulation is placed in the open cavities, then drywall is hung and finished before flooring, cabinetry, and trim are installed in sequence so each finish layer goes down in the correct order.

  • How do you identify what is included versus excluded in the remodel contract?

    Every scope item—which walls open, which systems are addressed, which finishes are supplied—is listed in writing at the estimate stage so both parties are working from the same definition of the project before work begins.

Litvin & Sons brings 30 years of remodeling experience to projects in Scranton, working through the structural and systems conditions that define older homes in this area. To review the specific spaces and conditions at your property, request a written estimate that documents the scope before any work starts. Litvin & Sons also handles whole-home remodeling in Wilkes-Barre, Dunmore, Clarks Summit, Pittston, and Lake Wallenpaupack.